Scope: Reconstruct Ocean Drive to create the flexibility to eliminate or limit vehicular traffic with a full street redesign; convert roadways into decorative and ADA accessible paver or stone pathways; install a new drainage system and security bollards. NOTE: The total G.O. Bond budget for this project is $20 million. $2 million is funded in Tranche 1 and $18 million will be allocated in Tranche 2.
